Notes:

This was to be just a link page to the pictures showing the progress on the building. Until I find a better way to update a gallery, this will have to suffice.

I will update the photos regularly, and you can keep checking back.

 

New Slide Show here.

The Oldest Pictures from the construction (April and May):

office panorama

Above is from evening, April 16; ready for slab pour.

Below, from morning, April 21, slab pour complete, and framing on deck:

office panorama

Below, framers made great progress on Wednesday, 21st. This, as of dawn, April 22:

pan 22apr

All the walls are up, and the rain remains at bay on April 23:

pan 23apr

front view

[Back to top] LATEST SHOTS

The sheathing is being added to the outside walls, April 23:

pan 24apr

front 24apr

Joists going on early this week of April 26, with rafters to follow:

office pan

All the joists are set on April 27, and a bit of rain sent the crew home early on Monday. The rafters will start April 28. The material above the joists this (28th) morning is scaffolding for rafter work:

office pan

office front

What a difference another day makes...morning of April 29:

pan 29apr

front 29apr

 

front 30apr

pan 30apr

Rain moved in about 10am on April 30. So, not much happened. Still rainy today, 5/1 (shown below), so it remains to be seen what progress is made. Roof decking should go on in the next few days of the work-week.

 

pan 1may

[Back to top] LATEST SHOTS

Friday and Saturday brought scattered showers, even some pea-sized hail--only one-half inch in total rain, but just enough at intervals to scrub the work for the end of the week. Foggy today, May 2, and the framers are resting up for a final push to "dry in" this week:

pan 2may

No real change over the weekend of May 1, so here's the lastest from the back side:

back 3may

Made great progress with the roof deck on Mondaym 5/3:

front 4may

pan 4may

Roof deck is complete. Roofer due in today, provided materials arrive. Happy cinco de mayo!

pan 5may

front 5may

[Back to top] LATEST SHOTS

Shingles ready to go on today, May 6.

front 6may

pan 6may

ROOF IS ON! Moving inside for electrical, heat/air, etc.

front 7may

back 7may

pan 7may

Visible progress on the exterior will probably slow down for a few weeks. Interior wiring, heat and air work is underway, along with some ceiling drywall work.

pan 9may

lobby 9may

[Back to top] LATEST SHOTS

The the reception room, looking south.

Looking East, two days later:

lobby 11may

In the halls, first looking west, second looking east. Seems like a long hallway, especially in the dark...

hall 13may

hall 13may

Our contractor reports there's a delay in getting the windows due to an aluminum shortage. We may be on a slow down for a week or so until the windows arrive.

The "Acme" truck delivered the brick Friday (5/14), as you can see outside the conference room window:

conf 14may

lobby 14may

Above, in the reception area, looking west.

Below, sound baffling in the NW corner office.

nw office 18may

pan 18may

[Back to top] LATEST SHOTS

Above, getting ready to start the brick-work.

Insulation foamed onto exterior walls, and gypsum board ready to go up (conference room):

conf 19may

Brick on back side:

back 19may

Wednesday (5/19) was a rainy day--all morning, and again in the evening. Not much happened but completion of the foam insulation on the exterior walls. Below are the walls of the NW office. Thursday may be rain-less, but still damp.

nw office 20may

nw office 20may

The brick-men and sheet-rock men were busy Thursday (5/20) and had great weather to work:

pan 21may

lobby 21may

[Back to top] LATEST SHOTS

Friday, May 20:

pan 22may

front 22may

The bricklayers worked some Saturday, adding to the front of the building:

front 23may

More progress on the brick...

front 25may

pan 25may

Front brick work completed. The door shown is temporary to secure the interior while awaiting delivery of the final door.

front 26may

[Back to top] LATEST SHOTS

Drywall crew has been busy inside, too. Mudding the seams, and screw locations. Below is the lobby, from the front door.

lobby 26may

WINDOWS! The windows finally arrived Thursday, and a couple were installed. More today--should be sealed up by the weekend. A milestone!

front 27may

nw office 27may

More windows installed...

pan 28may

All the windows are installed. The drywall mud man is there Saturday (5/29) to texture some inside walls.

front 29may

back 29may